Below are a few picture showing the completed frame. Before I put the body back on the frame
I have already installed the brake system. I replaced all the old steel brake lines with new
stainless steel lines. The brakes have been bled and all wheel cylinders/shoes have been adjusted.
I also replaced the old steel feul lines with stainless steel lines. Last but not least I put in place
the tail pipe which is, you guess it, stainless steel. Once the frame was completed I checked every nut
and bolt to insure everyone of them was tight.

  
  

1     2     3     4     5     6     7     8     9     10     11   12   13   14   15   16   17   18   19   20  

21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40  

41   42   43   44   45   46   47   48   49   50   51   52   53   54   55   56   57   58   59   60  

61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80  

81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100  

101   102   103   104   105   106   107   108